Validate and test

Prev Next

Back to Build AI-ready systems overview.

Prove schemas, mappings, and runtime behavior before publish. Tests are a first-class platform contract — not an optional CI garnish. Local validate is cheap; debugging cloud drift after a bad upload is not.

There are two prove families:

Family Proves Home
Connected System Package manifests, pipeline, live vendor or CIP Connected System tests
Role Assistant Governed assistant in dev / tst / pro Role Assistant tests

Neither family replaces the other. Why both proofs exist before production — and why agent SDKs and encoded workflow graphs are not substitutes — is on Proving Role Assistants.

Connected System structure, pipeline, and live E2E tests prove technical readiness — that the capability executes safely and correctly. Role Assistant and business test cases prove something different: that the assistant's answers reflect the capability contract the business actually meant — its business/semantic readiness. A green Connected System ladder is required but does not by itself prove the second; see Technical readiness vs business/semantic readiness and Business meaning as governed content for why both proofs stay separate.

Applying a Builder Integration Definition is a create path, not a test — see Apply an integration definition.

Who this is for

Role Use this band when…
Integration developer Every JSON edit — run validate before upload
Governance operator Running protection validate and subject-scoped governance tests
CI pipeline Gating merge on validate, integration, and optional E2E

Validation runs against Connected System and Business Entity manifests on disk. Integration and E2E commands require a published dataplane and resolved credentials.

In this phase

Page Proves
Validation, schemas, and repair JSON matches schemas; repair fixes manifest drift
CLI workflow reference Command order from scaffold to certify
Test ladder and protection Protection, governance, and certification overlay
Connected System tests Structure, pipeline, live E2E, and gold rows
Role Assistant tests role-assistant test catalog (YAML authoring stays in Operate)

Typical ladder

What this shows: Connected System proof from local validate through live E2E, then protection and certify. Role Assistant prove is a separate family.

What this is not: BID apply (create path) or YAML case authoring (Operate). Command flags live on the how-to pages.

Mermaid diagram

Configure pages define what to set; this band defines how to prove. After green tests, continue to Publish and certify.

Limits

E2E and governance tests hit live vendor APIs and identity — use sandbox credentials and scoped test subjects, not production admin tokens. Some test layers are optional in early scaffold phases; certification requires the full Connected System ladder in Certification. Role Assistant prove does not replace that ladder.

Next: Publish and certify.