Publish and certify

Prev Next

Back to Build AI-ready systems overview.

Expose governed capabilities, upload to the dataplane, and run Enterprise AI Certification — the proof that Role Assistants may rely on this Connected System.

Who this is for

Role Use this band when…
Integration developer Uploading config and running verify-* pillars
Architect Reviewing capability design and certification outcomes
Operator Confirming online state before widening Role Assistant scope

Publication makes capabilities available to Enterprise MCP and Role Assistants. Certification proves Connected System readiness (verify-operations wraps that ladder) — it is not Role Assistant YAML prove. Prove the assistant separately: Role Assistant tests.

In this phase

Page Outcome
Governed capabilities exposed + RBAC-aligned capability keys
CIP execution Transforms and sync steps in the execution layer
OpenAPI and MCP contracts Contract surfaces for AI clients
Deployment and upload Probe upload, publish, deploy
Certification verify-operations, verify-trust, verify-governance
Configure Enterprise MCP Runtime MCP after publish (reference)

Certification pillars (quick reference)

Pillar Command
Operations aifabrix verify-operations <systemKey>
Agent metadata trust aifabrix verify-trust <systemKey>
Governance aifabrix verify-governance <systemKey> --subject-email <scoped-user>

Then read the report: aifabrix lifecycle <systemKey>.

Prerequisites: Validate and test green for your scope; Configure business policies and protection upload complete before governance pillar.

Limits

Enterprise MCP runtime configuration varies by deployment. Upload success does not publish protection grants — follow protection upload before verify-governance. See Protection manifests and upload for the detailed YAML workflow.

Next: Operate.